HLT-01-LL
BUSS FUSEHOLDER W/ LONG LEADS
Fuse-holder, Telecom, 15 A, AC 125 V, DC 60 V, 1P, UL
Fuse accessory, Fuse-holder, Telecom, 15 A, AC 125 V, DC 60 V, 1P, UL, GMT fuse-links
ECCN: | |
Country of Origin: | MX |
EAN: | |
Weight: | 0.00 kg |
Length: | 0.00 m |
Width: | 0.00 m |
Height: | 0.00 m |