HLT-01-LL
BUSS FUSEHOLDER W/ LONG LEADS
Fuse-holder, Telecom, 15 A, AC 125 V, DC 60 V, 1P, UL
Fuse accessory, Fuse-holder, Telecom, 15 A, AC 125 V, DC 60 V, 1P, UL, GMT fuse-links
| ECCN: | |
| Country of Origin: | MX |
| EAN: | |
| Weight: | 0.00 kg |
| Length: | 0.00 m |
| Width: | 0.00 m |
| Height: | 0.00 m |